Yesterday, I visited Magic Mountain and also picked up my 2011 "Thrill Pass". I thought they changed the name to Thrill Pass this year? My pass still says 2011 Play Pass? Anyways, when we got there, it was already pretty busy but not as busy as weekends or summers but still crowded. We got there at about 11:00 which probably explains it. So, after we bought the passes we skipped the processing because the line was TERRIBLE, and first went to Colossus, at the time having no line. After that, it was onto Apocalypse, and then over to Samurai Summit. Ninja also had a long wait, which was odd since they were running two trains? We waited about 15-20 minutes, then it was onto Viper and Revolution, both which did not have any lines. Then, it was out of the park to processing which still had a long line. Note- Purchase them online. The online line was moving A LOT FASTER than the purchase at thhe park line. Luckily, the employee offered to take ours in to renew them so we wouldn't have to wait. She came back in less than 2 minutes with the new passes, with everyone else in line staring probably out of jealousy? Once we got back into the park, we headed over to Colossus County Fair to eat. On the way, we saw thay Yosemite Sam's Sierra Falls was demolished and removed, probably for construction. Rides after that were Riddler's Revenge, Batman, Viper, and Revolution to end the day. And at the very end in the parking lot, we noticed a firetruck racing through the employee road to the staff lot, with an ambulance behind it. Something must have happened??? Well, we saw nothing when we drove through the staff lot, which also showed no sign of new coaster track (which is where it usually is).